SERVICES
ENGINEERING WORKS
- Planing
- Project
- Engineering
- Inspection
- Design
- Surveyant
- NDT
MECHANICAL WORKS
- Piping
Natural gas systems
Petrol and gas lines
Fire fighting pipe lines
Steam and condense lines
Waste water pipe lines
- Boiler systems
- Gas and diesel boiler systems
- Wellhead and central gas treating&conditioning installations
- RMS-A, RMS-B, RMS-C stations
- Conversions of plant to natural gas firing
- LPG-Air, Propane-Air Mix Gas Industrial Stand-by systems Automated mixing process control
- Municipal&Residential LPG-Air Peak-Shaving installations, gas enrichment and leaning, Central heating systems
- Steel construction works
Pipe supports
Steel bridge
Platforms and handling rays
Containers
Steel structures
- Grit/sand blasting, epoxy coating
- Cathodic protections Works
CIVIL WORKS
- Excavations, filling stabilized and compaction works
- Concrete paving of roads and tank farm area
- Construction of concrete dike walls surrounding tanks
- Construction of various type of foundations and pipe culverts
- Construction of drain pits, manholes, ditches, channel related to OW (Oily Water) and RW (Rain Water) drainage systems
- Construction of pre-fabric structures
- Roof and floor insulation works
- Fire proofing systems
- Industrial and domestic waste channel-pipes Works
ELECTRICAL, ELECTRONICAL & INSTRUMENTATION WORKS
- DCS and PLC works
- Measurement of heating systems
- Measurement of pressure systems
- Level indicator systems
- Converters
- Manometers, thermometers and other instrumentations
- Exproof electrical line installation
- Electrical lines, panels, lighting masts and etc.
- Gas measurement and safety systems
WORKS ACCOMPLISHED IN THE YEARS 2001-2003
PIPING WORKS |
|
Fabrication and Erection of CS Piping (1/2”-20”) |
44.760 m |
Welds On CS Piping (1/2”-20”) |
4.800 Each |
Fabrication and Erection of U/G HDPE Piping (Æ 180-Æ 500) |
15.000 m |
Welds on HDPE Piping (Æ 180-Æ 500) |
1.500 Each |
Thermal Insulation Of Piping |
5.000 m |
GRID/SAND BLASTING&EPOXY COATING |
|
External Surfaces |
55.000 m2 |
Internal Surfaces |
32.000 m2 |
CIVIL WORKS |
|
Fabrication and Erection of Steel Structure |
780.000 kg |
Mechanical and Manual Excavation Loading and Trans. |
68.250 m3 |
Backfilling with Compacted Hardcore |
27.830 m3 |
Reinforced Concrete |
11.800 m3 |
Wooden and Steel Formwork |
26.000 m2 |
Reinforcement Steel Bars |
535.000 kg |
Pre-fabric Buildings |
1.250 m2 |
Scaffolding Works(1.8-20 m) |
300.000 m2 |
ELECTRICIAL WORKS |
|
Pull And Install Multi-Core Cable (Ex-Proof) (2x1,5 mm2-3x185+95) |
22.267 m |
Mounting of Cable Gland |
150 Each |
Mounting of Motor Control Station |
36 Each |
Multi-Core Copper Conductor for Earthing (16-120 mm2) |
3.500 m |
Installation of Cable Trays |
1.200 m |
Mounting of MCC Distribution and Control Panel with Frequency Convertor |
18 Each |
Mounting of Galvanized Single Cross Armed Lighting Pole |
92 Each |
SAFETY SCOREBOARD
- Days without lost-time injury : 140.220 day
- Manhour without lost-time injury : 1.121.760 manhour
DAY |
HOUR |
YEAR |
1,490 |
11,920 |
1996 |
10,820 |
86,560 |
1997 |
11,851 |
94,808 |
1998 |
12,795 |
102,360 |
1999 |
2,553 |
20,424 |
2000 |
8,857 |
70,856 |
2001 |
57,452 |
459,616 |
2002 |
34,402 |
275,216 |
2003 |