Company Mersin Free Trade Zone (MESBAS)
 Job Site Destruction of buildings&depots, parse of scrap and employable materials, stack of theese materials and arrangement works of the Free Zone enlargement area.
 Bid Value
 Job Start Date 13.05.2008
 Completion Date 13.07.2008
 Scobe of Work - Prepearing Works of free zone enlargement area (60 dunam) for adjusment - Distmantling of the roof, iron, steel, etc. materials from 18 unit depot buildings. Parse, transportation and stack of all theese materials. - Distmantling of the roof, iron, steel, etc. materials from mass houses, administering and dining hall buildings. Parse, transportation and stack of all theese materials. - Destruction of all theese depots and buildings. Transportation&effuse of the ballasts. - Distmantling of all materials from parking lot, storage and sports areas. Parse, transportation and stack of all theese materials. - Distmantling and crack of all concrate, asphalt, stone and green fields on all area(60 dunam). Transportation&effuse of the ballasts. - Saw of the different kinds trees on the field. Make trunk from theese woods. Transportation and stack of the trunks. - Adjustment of the area for make arable field.
 
Company BOTAŞ Petroleum Pipeline Corporation
 Job Site Adana/Ceyhan Storage Tanks Area – Tank No: D.651
 Bid Value
 Job Start Date 26.12.2005
 Completion Date 27.12.2006
 Scobe of Work ▪ Cleaning of crude oil sludges from tank ▪ Mechanical repairing of tank ▪ Sand blasting&epoxy coating of tank ▪ Sand blasting&epoxy coating of pipes ▪ Fabrication&erection of fire fighting systems ▪ Hydrostatic tests&calibration works of tank
 
Company Erenco A.S. (Sistem Const.)
 Job Site Slap Casting Plant Unit 1 / İskenderun Iron & Steel Fabric
 Bid Value
 Job Start Date 29.06.2005
 Completion Date 01.07.2006
 Scobe of Work ▪ Fabrication and erection of CS&SS pipes (3/4” – 48”) ▪ Fabrication and erection of pipe supports
 
Company MESBAS Mersin Free Trade Zone
 Job Site Port of Mersin
 Bid Value
 Job Start Date 22.05.2006
 Completion Date 22.06.2006
 Scobe of Work ▪ Erection of various sizes of 61 pieces fenders on port
 
Company Opet Petrolculuk A.S.
 Job Site Mersin Fuels Storage, Distribution and Loading Terminal
 Bid Value
 Job Start Date 01.05.2005
 Completion Date 01.11.2005
 Scobe of Work
  • Excavation works
  • Reinforcement steel bars
  • Concrete works of the pipe line
  • Fabrication and erection of pipe supports
  •  